Facility Setup Guide
Facility Machinery Guide: Legumes, Compost and Livestock
A reference for investors planning one of these facilities: equipment types and selection criteria for legume cleaning and packing, compost and livestock facilities. The machinery list is finalised through capacity feasibility and the current grant guide.
5 Tons / Day (Single Shift)
Annual ~1,500 Tons Organic Yield
50% – 65% Non-Refundable
Measures 101 & 301 Eligible
~3.590.000 ₺ (Net)
Grant Share: ~2.217.000 ₺
163.000 ₺ (%4.6)
8 Key Risks Mitigated
3 Investment Scenarios & Required Equipment
Standard machinery setups across legume processing, biological composting, and livestock infrastructure:
Option 1: Legume Processing and Packaging Facility
- Intake and pre-cleaning: Intake screening, aspirator (dust and chaff removal), destoner to remove stones and soil particles.
- Grading, sorting and quality control: Screen grading by grain size, metal detector, basic testing and retained sample set (with optional optical color sorter unit in later stages).
- Packaging and labelling: Semi-automatic weigh-filling machine, bag heat-sealer / stitching unit, date and batch coder, compliant retail labelling.
- Storage and internal logistics: Pallet racks, battery pallet truck, moisture- and pest-protected enclosed warehouse space.
Option 2: Open-Platform Compost Facility (Organic Manure HOG-A)
- Raw material intake and mixing: Mixer / bucket loader to homogenise farmyard manure, straw and agricultural residues.
- Compost windrow turner: Tractor PTO-driven windrow turner with aerating drum to aerate the piles and accelerate aerobic fermentation.
- Windrow temperature and moisture tracking: Wireless IoT probes monitoring the 55–65 °C pasteurisation threshold and pile moisture remotely.
- Screening and classification (Trommel): Rotary drum screen separating mature fine compost from oversized residues, foreign matter and coarse fiber.
- Bagging and weighing: Semi-automatic bag filler, bag stitching machine (for 25–50 kg bags) and 1–3 ton platform scale.
- Leachate drainage: Concrete platform slope, leachate collection channel and submersible effluent pump.
Option 3: Livestock Facility (Cattle / Small Ruminants)
- Feed preparation and distribution: Vertical/horizontal auger feed mixer-wagon (TMR ration mixer), tractor-towed feed distributor, bale processor.
- Manure management and separator: In-barn automatic hydraulic or chain alley scrapers, manure mixer, effluent pump and solid-liquid manure separator.
- Watering and drinkers: Frost-free thermal drinkers, float-controlled stainless steel water bowls, booster pump and filtration unit.
- Barn climate and animal welfare: High-volume ventilation fans, misting cooling systems, automatic windbreak curtains, cow massage brushes and rubber bedding mats.
- Milking and cooling (in dairy scenario): Herringbone milking parlour, vacuum pump, automated CIP wash unit and stainless bulk milk cooling tank.
- Weighing and herd management: Digital animal weigh scale, electronic RFID ear-tag readers and herd management software terminal.
General Quoting, Procurement and Eligibility Rules
- New and unused requirement: All machinery procured under the grant must be brand-new; second-hand equipment is strictly disqualified.
- Documentation package: CE certificate, manufacturer warranty certificate, Turkish maintenance manual, test report / credit conformity and product catalogue.
- Weights and measures certification: Trade scales and weighing platforms must have official metrology stamps.
- Products not processed in the facility (e.g. tarhana, pekmez) are sourced ready-made and labelled from producers; no production equipment for a different product group is added to the same project.
5 T/Day Compost & Packaging Line Investment Budget
Based on IPARD (Measure 101/301) and rural grant ceiling figures with current OEM proformas (Excl. VAT).
| # | Machine / Item | Specification & Reference | Amount (Net) | Grant % | Grant Share | Equity |
|---|---|---|---|---|---|---|
| 1 | Heavy-Duty Manure Shredder & Mixer | 5-7 t/h, Hardox blades, twin-auger mixer (Tınaz, Fimaks or equivalent) | 650.000 ₺ | %60 | 390.000 ₺ | 260.000 ₺ |
| 2 | Enclosed Bioreactor Composting Unit (Innovation) | 24-48h pre-fermentation, odor-controlled, PLC regulated aeration (Zeosta, Özyeşilyurt or equivalent) | 1.450.000 ₺ | %65 | 942.500 ₺ | 507.500 ₺ |
| 3 | Rotary Trommel Screen Separator | 3-5 mm mesh aperture, fiber and debris separator, 5 t/h rotary screen | 320.000 ₺ | %60 | 192.000 ₺ | 128.000 ₺ |
| 4 | Semi-Automatic Bagging & Packaging Line | AISI 304 stainless steel, 5-25-50 kg auger filler, weighing bucket, stitching conveyor (Yüksan, STK or eq.) | 780.000 ₺ | %60 | 468.000 ₺ | 312.000 ₺ |
| 5 | IoT Moisture, Temperature & Aeration Station | Raspberry Pi / industrial probes, wireless telemetry, remote dashboard (High Innovation Scoring) | 95.000 ₺ | %65 | 61.750 ₺ | 33.250 ₺ |
| 6 | End-of-Line Pallet Wrapping & Stacking | Rotary turntable pallet wrapper and hydraulic pallet jack (Hasel or equivalent) | 140.000 ₺ | %50 | 70.000 ₺ | 70.000 ₺ |
| 7 | Quality Assurance & Field Lab Kit | Digital deep probe compost thermometer, portable pH/EC meter, rapid moisture analyzer | 65.000 ₺ | %60 | 39.000 ₺ | 26.000 ₺ |
| 8 | Installation, Commissioning & Operator Training | On-site professional installation, 380V wiring, and factory operational certification | 90.000 ₺ | %60 | 54.000 ₺ | 36.000 ₺ |
| TOTAL INVESTMENT BUDGET | 3.590.000 ₺ | %61.7 Ort. | 2.217.250 ₺ | 1.372.750 ₺ | ||
⚠️ VAT Exemption Timing
Until VAT exemption certificate is issued, temporary cash allocation is necessary for the ~20% VAT tranche.
🏗️ Civil Works & Floor Needs
Eziler site requires minimum 250 sqm reinforced slab, leachate runoff drainage, and 380V industrial power.
📦 Packaging Initial Stock
First 3 months of operations require 10,000 laminated 25 kg bags and stitching yarn reserve (~120,000 TL).
4 Golden Rules for TKDK Technical Specifications
Mandatory specification criteria to prevent disqualification and ensure 100% grant approval:
01No-Brand Rule ('Or Equivalent')
Never copy an OEM brochure directly. Specifications must remain competitive: 'Tınaz, Yüksan or equivalent, with minimum 5 t/h capacity'.
02AISI 304 Stainless Steel Standard
All product contact parts (hoppers, augers, buckets) must be AISI 304 stainless steel. Carbon steel corrodes within 2 seasons under organic acids.
03Mandatory Certificates (CE & Capacity)
Suppliers must submit CE certificates (2006/42/EC), certified industrial capacity reports, 2-year warranty, and 48h emergency field service commitment.
04Measurable Numerical Metrics
Subjective wording is rejected. Always state measurable thresholds: 'Minimum 500-1,000 kg/h', 'Accuracy tolerance within ±1%', 'Drive power minimum 5.5 kW'.
Facility Risk Register & Mitigation Matrix
8 mission-critical risks identified to protect capital during implementation, complete with technical counter-measures:
Ineligible Expense / VAT Error: Invoicing before grant contract execution or erroneous VAT exemption resulting in disqualification.
Cash Flow Liquidity Gap: Delayed milestone reimbursement in 'spend first, claim later' protocol triggering supplier distress.
Material Non-Compliance: Supplier dispatching painted carbon steel instead of certified AISI 304 or undersized motor drive.
Rural Voltage Fluctuation: Grid surges damaging sensitive PLC boards and electronic loadcell weighing units.
High-Moisture Feedstock Clogging: 35-40% moisture manure bridging inside the feed hopper, compromising bagging accuracy.
Machinery Delivery Delays: Factory delays jeopardizing the mandatory IPARD investment completion deadline.
Odor & Community Complaints: Open windrow odors triggering environmental authority notices or stoppage.
Fertilizer Licensing Delay: Ministry registration assay delays postponing retail packaged sales.
Get Technical Specification & Grant Consultancy for Your Facility
We apply the exact same engineering, budgeting, and risk mitigation standards to client projects across the Aegean. Safeguard your grant application.